Construction Images_Day 2_4:18:08
5 rows down 22 to go! Avergaing roughly 2-3 rows per hour. All bolts still need to be tightened to fix curvature in place.
View ArticleConstruction Images_Day 6_4:23:08
Images from the ground work construction. 2″ Concrete base to stabilize ( 8 ) 5/8″ x 2′ threaded rods driven into grade. Leveling nuts and gaskets will secure the base panels to the threaded rod.
View ArticleConstruction Images Day 8_4:25:08
Images from Phase 2: (12) 4′x8′ sheets CNC fabricated by Continental Signs and Jared Laucks. (www.continentalsigns.net) 2 Full strips (27 panels) have been folded, riveted and bolted together. 5...
View ArticleConstruction Images Day 10 : 4:27:08
The threaded rod has been set into the concrete and the ground panels have been bolted in place. The first rows are taking shape and beginning to transition from horizontal to vertical.
View ArticleConstruction Day 17_5:4:08
A few photos as the canopy touches down with the ramp. Assembly has been completed: (Final photos will be up soon!) -All panels are in place & tightened with lock nuts (except 1 which needs to be...
View ArticleTesselion Complete!
Images from the completed installation, Tesselion: Adaptive Quadrilateral Flat Panelization. www.tesselion.wordpress.com Material Sponsor: Alliance Metals ( www.alliancemetals.com) Fabrication Sponsor:...
View ArticleMore Final Images
Tesselion is located at the Philadelphia University Architecture & Design Building & will be up until October. Address : 4201 Henry Ave. Philadelphia, PA 19144 Feel free to visit & take...